E1A11 (A) [97.219]
What is the first action you should take if your digital message forwarding station
inadvertently forwards a communication that violates FCC rules?
A. Discontinue forwarding the communication as soon as you become aware of it
B. Notify the originating station that the communication does not comply with FCC
rules
C. Notify the nearest FCC Field Engineer’s office
D. Discontinue forwarding all messages
~~
E1A12 (A) [97.11]
If an amateur station is installed on board a ship or aircraft, what condition must
be met before the station is operated?
A. Its operation must be approved by the master of the ship or the pilot in command
of the aircraft
B. The amateur station operator must agree to not transmit when the main ship or
aircraft radios are in use
C. It must have a power supply that is completely independent of the main ship or
aircraft power supply
D. Its operator must have an FCC Marine or Aircraft endorsement on his or her amateur
license
~~
E1A13 (B) [97.5]
When a US-registered vessel is in international waters, what type of FCC-issued
license or permit is required to transmit amateur communications from an on-board
amateur transmitter?
A. Any amateur license with an FCC Marine or Aircraft endorsement
B. Any amateur license or reciprocal permit for alien amateur licensee
C. Only General class or higher amateur licenses
D. An unrestricted Radiotelephone Operator Permit
~~
E1B Station restrictions and special operations: restrictions on station location;
general operating restrictions, spurious emissions, control operator reimbursement;
antenna structure restrictions; RACES operations
E1B01 (D) [97.3]
Which of the following constitutes a spurious emission?
A. An amateur station transmission made at random without the proper call sign
identification
B. A signal transmitted in a way that prevents its detection by any station other
than the intended recipient
C. Any transmitted bogus signal that interferes with another licensed radio station
D. An emission outside its necessary bandwidth that can be reduced or eliminated
without affecting the information transmitted
~~
E1B02 (D) [97.13]
Which of the following factors might cause the physical location of an amateur
station apparatus or antenna structure to be restricted?
A. The location is in or near an area of political conflict, military maneuvers or
major construction
B. The location's geographical or horticultural importance
C. The location is in an ITU zone designated for coordination with one or more
foreign governments
D. The location is significant to our environment, American history, architecture, or
culture.
~~
E1B03 (A) [97.13]
Within what distance must an amateur station protect an FCC monitoring facility from
harmful interference?
A. 1 mile
B. 3 miles
C. 10 miles
D. 30 miles
~~
E1B04 (C) [97.13, 1.1305-1.1319]
What must be done before placing an amateur station within an officially designated
wilderness area or wildlife preserve, or an area listed in the National Register of
Historical Places?
A. A proposal must be submitted to the National Park Service
B. A letter of intent must be filed with the National Audubon Society
C. An Environmental Assessment must be submitted to the FCC
D. A form FSD-15 must be submitted to the Department of the Interior
~~
E1B05 (B) [97.15]
What height restrictions apply to an amateur station antenna structure not close to a
public use airport unless the FAA is notified and it is registered with the FCC?
A. It must not extend more than 300 feet above average height of terrain surrounding
the site
B. It must be no higher than 200 feet above ground level at its site
C. There are no height restrictions because the structure obviously would not be a
hazard to aircraft in flight
D. It must not extend more than 100 feet above sea level or the rim of the nearest
valley or canyon
~~
E1B06 (A) [97.15]
Which of the following additional rules apply if you are installing an amateur
station antenna at a site within 20,000 feet of a public use airport?
A. You may have to notify the Federal Aviation Administration and register it with
the FCC
B. No special rules apply if your antenna structure will be less than 300 feet in
height
C. You must file an Environmental Impact Statement with the EPA before construction
begins
D. You must obtain a construction permit from the airport zoning authority
~~
E1B07 (A) [97.15]
Whose approval is required before erecting an amateur station antenna located at or
near a public use airport if the antenna would exceed a certain height depending upon
the antenna’s distance from the nearest active runway?
A. The FAA must be notified and it must be registered with the FCC
B. Approval must be obtained from the airport manager
C. Approval must be obtained from the local zoning authorities
D. The FAA must approve any antenna structure that is higher than 20 feet
~~
E1B08 (D) [97.121]
On what frequencies may the operation of an amateur station be restricted if its
emissions cause interference to the reception of a domestic broadcast station on a
receiver of good engineering design?
A. On the frequency used by the domestic broadcast station
B. On all frequencies below 30 MHz
C. On all frequencies above 30 MHz
D. On the interfering amateur service transmitting frequencies
~~
No comments:
Post a Comment