The second photo shows the long tube ready to be cemented.
The third photo shows the finished 20 meter connection as well as the PL259 to install the feed line.
Here is the assembled centerpost. The only thing missing is the cap with the eyebolt. A little silicone caulk to make sure all joints are sealed and this assembly is watertight.
No comments:
Post a Comment